Case Study - Information Sheet
Printed Circuit Board Assembly
1 Background
Philips Electronics produces printed circuit boards (PCBs) for use in consumer electronics (audio and video equipment, personal computers) and in professional industries
(telecommunication systems, aircraft navigation, medical equipment). Special machines
are used to mount components onto the boards. The problem to be considered is one
of production preparation: for each type of PCB, it is necessary to specify the way in
which the components should be mounted.
This case study is based on work carried out for one of the major product divisions
of Philips. Although some simplifications have been made to the original problem, this
does not affect the main characteristics of the decisions that have to be taken.
2 Assembly of PCBs
PCBs are assembled by automated machines. A conveyor feeds each board into the first
machine, and transports the boards between machines. Thus, a board passes into the
first machine where a selected subset of components are mounted, then passes to the
second machine where further component mountings are performed, and so on, until the
last machine completes the PCB. The conveyor moves all partially assembled boards to
the next machine simultaneously. Thus, the conveyor only moves when every machine
has completed its work on a board. For example, if there are eleven components to be
mounted by three machines, A, B and C, where machine A mounts components 1, 2,
3 and 4 and takes 8 seconds, machine B mounts components 5, 6 and 7 and takes 12
seconds, and machine C mounts components 8, 9, 10 and 11 and takes 9 seconds, then the
conveyor moves the boards every 12 seconds. Consequently, the first PCB is completed
after 36 seconds, and a further PCB is completed at the end of each subsequent 12-second
interval.
The components to be mounted on the board are contained in feeders on one side of
the conveyor. The components are classified into different types, and each feeder only
contains components of a single type.
Each machine has a robot arm with three heads. The heads are each fitted with a
piece of equipment which can pick components from the feeders and subsequently place
them on the board. At most one component at a time can be carried by a head. Note that
each component type can only be handled by a subset of the set of head equipments. In
other words, a head with a given piece of equipment can only pick and place components
of a limited set of component types.
The mounting process consists of a sequence of pick-and-place moves. In the picking
phase, the heads pick a component from the relevant feeders in turn. The order is
fixed: the first head picks first, then the second, and finally the third head. During
1
the placing phase, the robot arm moves to appropriate points on the board so that
the components can be sequentially mounted. In contrast to the picking, the order in
which the components are mounted can be chosen. Note that it is possible to choose
pick-and-place moves in which only one or two of the three heads are used.
To illustrate the process, consider the following example in which a single machine is
used to mount five components on a board. There are two components of type α, one of
type β, and two of type γ. The feeders for these component types have coordinates (5,
0), (10, 0), and (15, 0), respectively. Further, the two α components have to be mounted
at locations with coordinates a1 = (10, 2) and a2 = (10, 12), the β component has to
be mounted at a location with coordinates b1 = (6, 5), and the two γ components have
to be mounted at locations with coordinates c1 = (15, 8) and c2 = (14, 16). Suppose
that, on the first pick-and-place move, the second α component is assigned to head 1,
the β component is assigned to head 2, and the first γ component is assigned to head
3, and that these components are mounted in the order γ, α and β. Then, the robot
arm moves successively between locations (5, 0), (10, 0), (15, 0), (15, 8), (10, 12) and
(6, 5): a total distance of 5 + 5 + 8 + √
41 + √
65 = **.49. Suppose that on the second
pick-and-place move, the first α component is assigned to head 1, and the second γ
component is assigned to head 2, and that these components are mounted in the order
α and γ. Starting at the location (6, 5) where the last component was mounted on the
previous move, the robot arm moves successively between locations (5, 0), (15, 0), (10, 2)
and (14, 16): a total distance of √
26 + 10 + √
29 + √
212 = 35.04. These pick-and-place
moves are illustrated in Figures 1a and 1b, respectively.
Figure 1: (a) First pick and place move; (b) Second pick and place move (the solid line
denotes the route travelled by the arm during this move)
2
3 Throughput
It is required to maximize the throughput of the assembly line, which is determined by
the machine with the heaviest workload. The workload of a machine is proportional to
the total distance travelled by the robot arm. In computing this distance, you should
assume that, when the conveyor moves, the robot arm remains at the position where the
last component was placed until the new board arrives. Increased throughput is achieved
by:
• avoiding large movements of the robot arm;
• balancing the workload between machines.
The scheme that is selected should minimize the time required for the busiest machine
to complete all of its mounting operations.
4 Data
Relevant data for the problem are as follows. There are three machines, and 102 components to be mounted on the board. The components are of 10 different types, which are
labelled as type A, type B, etc., up to type J. There are nine pieces of equipment which
are to be fitted on the heads, and no piece of equipment is duplicated. The following
table lists the equipment, giving the component types that each piece of equipment can
handle.
Piece of equipment Types of components that can be mounted
Figure 2 displays the feeder positions, and shows the positions of the component
types on the board. The feeders for components of types A, . . . , J have coordinates (2,
0), . . ., (11, 0), respectively. The board is depicted below the feeders. The components
to be mounted at the top of the board have coordinates (1, 2), . . . , (12, 2), and the
components to be mounted at the bottom of the board have coordinates (1, 13), . . . ,
(12, 13). There are some locations on the board where no component is to be fitted.
For example, no component is required at the position with coordinated (9, 5), while a
component of type J is to be mounted at the position with coordinates (10, 5).
Note that the times required to pick a component from a feeder, to mount a component on a board, and to move the board on the conveyor are neglibible.
eeders
Figure 2: Layout of the PCB board
請加QQ:99515681  郵箱:99515681@qq.com   WX:codinghelp









 

掃一掃在手機打開當前頁
  • 上一篇:代做DTS204TC、代寫Java編程語言
  • 下一篇:CSC4140代做、代寫Python/Java編程設計
  • 無相關信息
    合肥生活資訊

    合肥圖文信息
    2025年10月份更新拼多多改銷助手小象助手多多出評軟件
    2025年10月份更新拼多多改銷助手小象助手多
    有限元分析 CAE仿真分析服務-企業/產品研發/客戶要求/設計優化
    有限元分析 CAE仿真分析服務-企業/產品研發
    急尋熱仿真分析?代做熱仿真服務+熱設計優化
    急尋熱仿真分析?代做熱仿真服務+熱設計優化
    出評 開團工具
    出評 開團工具
    挖掘機濾芯提升發動機性能
    挖掘機濾芯提升發動機性能
    海信羅馬假日洗衣機亮相AWE  復古美學與現代科技完美結合
    海信羅馬假日洗衣機亮相AWE 復古美學與現代
    合肥機場巴士4號線
    合肥機場巴士4號線
    合肥機場巴士3號線
    合肥機場巴士3號線
  • 短信驗證碼 目錄網 排行網

    關于我們 | 打賞支持 | 廣告服務 | 聯系我們 | 網站地圖 | 免責聲明 | 幫助中心 | 友情鏈接 |

    Copyright © 2025 hfw.cc Inc. All Rights Reserved. 合肥網 版權所有
    ICP備06013414號-3 公安備 42010502001045

    爽好多水快深点欧美视频| 精品久久亚洲| 四季av在线一区二区三区| 成人在线免费观看视频| 日本美女一区二区三区视频| 免费av成人在线| 特黄特色欧美大片| 国产成人短视频在线观看| 男人的天堂免费在线视频| 免费不卡中文字幕在线| 日本一不卡视频| 麻豆国产一区二区| 偷拍中文亚洲欧美动漫| 一本久道久久综合婷婷鲸鱼| 成人免费在线电影网| 综合激情网站| 亚洲国产91| 日韩免费看片| 爽成人777777婷婷| 伊人成人在线视频| 99久精品视频在线观看视频| 日韩电影在线观看一区| 亚洲美女色禁图| 亚洲tv在线| 神马午夜在线视频| 国产精品传媒精东影业在线| 黑丝一区二区| 欧美福利专区| 久久九九国产| 超碰成人免费| 日韩激情中文字幕| 国产亚洲欧美日韩在线观看一区二区 | 日韩av福利| 四季av一区二区凹凸精品| 国产手机视频一区二区| 欧美1区免费| 国产精品99一区二区| 国产精品久久久久av蜜臀| 中文字幕一区日韩精品| 午夜精品福利影院| 国内精品久久久久久99蜜桃| av日韩一区| 99久久久国产| 中文字幕av亚洲精品一部二部| 日本不卡不码高清免费观看| 国产精品亚洲综合色区韩国| 国产资源一区| 国产精品亚洲产品| 亚洲视频二区| 国产精品国码视频| 一区二区三区在线| www.成人在线.com| 国产精品免费不| 亚洲人体av| 国产一区二区三区91| 国产精品免费不| 日韩成人一级片| 日韩影片在线观看| www.豆豆成人网.com| 成人在线免费观看网站| 成人免费av| 亚洲二区视频| 国产视频一区三区| 91麻豆国产自产在线观看亚洲| av在线中出| 日韩黄色在线| 亚洲精品日本| 亚洲影院天堂中文av色| 麻豆久久一区| 亚洲啊v在线观看| 欧美日韩激情| 99国产精品视频免费观看一公开| 蘑菇福利视频一区播放| 日韩理论视频| 国产欧美综合一区二区三区| 亚洲国产日韩欧美一区二区三区| 国产高清日韩| 日韩欧美中文字幕在线视频 | 蜜桃久久精品一区二区| 高清不卡亚洲| 欧美一区不卡| 亚洲动漫精品| 精品久久不卡| 亚洲视频www| 手机在线观看av网站| 国产日韩精品视频一区二区三区 | 黄色成人在线视频| 在线看片日韩| 精品视频国内| 99久久婷婷这里只有精品 | 国产一区二区欧美| 精品亚洲自拍| 亚洲综合日韩| 国产极品久久久久久久久波多结野| 青青草成人在线观看| 日韩经典中文字幕一区| 久久一区91| 春色校园综合激情亚洲| 日韩国产精品91| 久久伊人影院| 艳女tv在线观看国产一区| 麻豆理论在线观看| 麻豆国产精品官网| 亚洲精品一区国产| 亚洲免费大片| 久久精品国产久精国产| 久久精品一级| 一区免费视频| 国产日韩一区| 黄色成人美女网站| 米奇777在线欧美播放| 日韩一区中文| 亚洲精品福利| 国产精品99久久精品| 国产精品扒开腿做爽爽爽软件| 欧美日韩一区二区三区在线电影| 天堂成人免费av电影一区| 麻豆视频一区二区| 男人的天堂久久| 视频在线不卡免费观看| 亚洲色图网站| 91久久久精品国产| 久久精品黄色| 欧洲亚洲一区二区三区| 成人福利视频| 日韩有码av| 三级欧美在线一区| 中文视频一区| 天天做综合网| 久久精品国产99| 久久久久在线| 精品久久福利| 精品国产乱码| 欧美aa一级| 成人av地址| 日韩大片在线| 91精品国产乱码久久久竹菊| 色喇叭免费久久综合网| 国产免费av一区二区三区| 日韩午夜在线电影| 亚洲色图插插| 中文精品在线| 亚洲精品无播放器在线播放| 亚洲精品1区2区| 不卡一区视频| 蜜桃一区二区三区在线观看| 欧州一区二区三区| 日韩中文字幕不卡| 国产一区二区三区天码| 老妇喷水一区二区三区| 国产精品免费不| 四季av一区二区三区免费观看| 五月亚洲婷婷| 日本一区二区三区视频在线| 日本a级不卡| 欧美在线黄色| 影院欧美亚洲| 国产影视一区| 中文字幕在线高清| 福利在线一区| 精品美女一区| 亚洲精品91| 国产不卡精品| 国产一二在线播放| 久久青草久久| 久久久亚洲欧洲日产| 模特精品在线| 视频精品一区二区三区| 视频二区不卡| 亚洲精品a级片| 久久最新网址| 亚洲涩涩在线| 亚洲第一天堂| 精品国产亚洲一区二区三区在线| 日本欧美不卡| 久久精品道一区二区三区| 亚洲色图国产| av中文在线资源库| 丝袜av一区| 粉嫩一区二区三区在线观看| 亚洲v.com| 欧美午夜不卡| 久久精品免视看国产成人| 日韩成人一区| 天堂va蜜桃一区二区三区漫画版| www国产精品| 欧美激情91| 天堂在线中文网官网| 女人av一区| 国产日韩在线观看视频| 日本欧美一区二区| 蜜臀av在线播放一区二区三区| 久久精品福利| 亚欧日韩另类中文欧美| 日韩久久99| 久久uomeier| 欧美天堂亚洲电影院在线观看| 操欧美女人视频| 中文成人在线| 99蜜月精品久久91|